Golden Triangle Station

Golden Triangle Station

Key station features

  • Employment area
  • New transit business parks
  • Park and ride location
  • Significant public art opportunity

Read about station features

Station overview

Golden Triangle Station is a major regional employment center with more than 20,000 jobs. The station is located beside 9.8 million square feet of industrial and office space for Supervalu Foods, Starkey Labs, Cigna and the Minnesota Vikings.

The surrounding area includes Nine Mile Creek and its scenic bluffs, trails and parks, including an off-leash dog area. The area is predominantly warehouse/distribution and manufacturing, with some multi-family residential buildings.

Future development is envisioned for the 200 acres of land adjacent to the proposed station, including housing, retail and office development, as well as work to preserve the natural beauty of Nine Mile Creek.

Investment framework for the station

The maps and plans below are included in the Golden Triangle Transitional Station Area Action Plan (TSAAP), which can be found in the Southwest Corridor investment framework. Read the full investment framework.

Existing conditions - TSAAP

  • Station location
    Station location (page 15-3)
  • Land use
    Land use (page 15-4)
  • Roadway network
    Roadway network (page 15-5)
  • Transit
    Transit (page 15-5)
  • Sidewalks
    Sidewalks, trails and bikeways (page 15-6)
  • Sanitary sewer
    Sanitary sewer (page 15-6)
  • Water main
    Water main (page 15-7)
  • Stormwater
    Stormwater (page 15-7)

Existing conditions - housing data

  • Possible summary
    Summary
  • Station map
    Affordable housing map
  • Housing chart
    Affordable housing chart
  • Homestead status
    Homestead status
  • Year structure built
    Year structure built
  • Market value
    Market value

Future plans - opening day (2019) and long term

  • Access circulation
    Access and circulation plan (page 15-10)
  • Station area improvements
    Station area improvements (page 15-11)
  • Opening day
    Opening day station area improvements (page 15-12)
  • Potential development sites
    Potential development sites (page 15-18)
  • Station area utility plan
    Station area utility plan (page 15-23)
Top